American Transmission Co. projects

Project website for a Wisconsin-based company that owns and operates the high-voltage electric transmission system that powers communities in portions of the Upper Midwest.

Media Line: (877) 506-6117info(at)atcllc.com

American Transmission Co. energizes Spring Valley-North Lake Geneva Electric Reliability Project

Project addresses electric system needs, supports the community and environment

PEWAUKEE, Wis. – The Spring Valley-North Lake Geneva Electric Reliability Project, which electrically connects Kenosha County with the Lake Geneva area, is energized and now part of an integrated electric system serving customers in the region. This 23-mile, 138,000-volt transmission line was approved by the Public Service Commission of Wisconsin in March 2016 and construction initiated in 2017.

Components of the $71 million project include: construction of a new 138,000-volt transmission line stretching from the North Lake Geneva Substation in southern Walworth County to the Spring Valley Substation in western Kenosha County, construction of the new Balsam Substation along Wisconsin State Trunk Highway 50 in the town of Wheatland and construction of a new 69,000-volt transmission line to connect the new substation to the Twin Lakes Substation in Twin Lakes.

“There were several unique challenges in the planning of this project,” said ATC Senior Project Manager Doug Berton. “In addition to addressing transmission reliability for the region, we also needed to consider the reconfiguration needs of the lower-voltage system. The Spring Valley-North Lake Geneva project now provides system redundancy and allows for maintenance outages when repairs are needed.”

ATC also worked with its environmental contractor, Stantec, to re-vegetate areas along the route in addition to the perimeter of the substation with a pollinator-friendly seed mix. To date, the substation site has reached 70% re-vegetation, a scoring well-suited for pollinator habitat. ATC also funded the transplant of several dozen trees from the substation site to a local school as part of the Trees for Threes program with the Milwaukee Bucks.

“We appreciate the cooperation of area residents as we worked on this project, beginning with public involvement in 2013 to completing construction,” said ATC Director of Environmental and Local Relations Gregory Levesque. “We will continue restoration on portions of the project in the coming months and continue monitoring pollinator habitats over the next several years.”

Visit www.atc-projects.com for more information. A map of the project can be found here.

# # #

ATC is a Wisconsin-based company that moves energy along the regional electric grid in parts of Wisconsin, Michigan, Minnesota and Illinois, serving more than 5 million electric consumers. We are experts at what we do: planning, maintaining, operating and protecting the grid. As the electric industry moves toward renewable generation sources, we are transforming our system to continue delivering energy reliably and safely. We proudly support STEM education programs that empower youth with the skills needed to succeed in tomorrow’s energy workforce. For more information, visit www.atcllc.com and follow us on LinkedIn and X (Twitter).