Project overview
ATC has completed construction and placed in service approximately 14 miles a new 138-kilovolt transmission line connecting a new substation located east of Horicon to an existing substation south of Neosho.
The electric transmission system that serves the communities of Beaver Dam, Hustisford, Horicon, and central Dodge County will benefit from a more reliable system to serve the growing area. Previously, the electric system was operating at maximum capacity and could not accommodate growth in electric usage or maintain service in the event of an equipment failure.
At a glance
Communities affected: Rubicon, Neosho, Hustisford, Horicon. All of central Dodge County will benefit from this transmission upgrade.
Length of line: 15 miles
End points: Substation near Horicon and Rubicon Substation south of Neosho.
Voltage: 138 kilovolts
Type of pole: Steel, single-pole
Height of poles: 65 - 100 feet
Status of project: Construction completed
Estimated cost: $22 million
Timeline
Open House to review final routes: November 2005
File construction applications with PSC: February 2006
PSC approval: December 2006
Anticipated start of construction: Fall 2007
In-service date: May 2008